Camp Sunrise - Projects
Project #18. (posted 4/10/08 - status: Done!)
Replace shower stall in the Health Lodge
There is an existing 36” square fiberglass shower stall in the Health Lodge that needs to be replaced. The project will involve basic plumbing skills and some light carpentry to remove and replace existing trim boards. Besides the stall itself the project will require the installation of a new shower drain fitting and a new single handle shower valve. The existing showerhead appears to be all right.
THANK YOU to Crew 167, Ethan Allen District, for completing this project!